3 High quality FRP Tanks were installed, each one of them can store up to 40 m3 of Ferric Chloride, in addition a drain (emergency) Tank with a volume of 40 m3 was also installed.
4 High durability hose pumps were installed at the dosing points, connected to VFDs to accurately set the required dose.
An advanced SCADA system was used to control and monitor the system to guarantee the highest level of safety and fault free process.
Follow us for updates, innovations, and industry insights.